Lowry Center Operations
Below is a snapshot of the phases of construction along with a schedule of temporary relocations of services and offices and when we expect a return to their permanent locations in Lowry Center.
Follow Transformation Progress- Spring 2021: Relocation of existing Lowry offices and services. Dining, C-Store, Post Office, Copy Center will remain until May 10, 2021.
- Summer 2021-Summer 2022: Phase I construction of new 8,000 sq. ft atrium and renovation of main and lower levels. Phase II construction begins on upper level in summer 2022.
- Fall 2022-Spring 2023: Construction is completed on main and lower levels and offices and services begin to return to their permanent locations. Phase II construction continues on upper level.
- January 2023: Construction on the renovated and expanded Lowry Center is scheduled to be completed by early January 2023, prior to the start of the spring semester. All services and offices move to their permanent locations in Lowry Center.
Temporary Relocation Schedule
Lowry Center will close its doors for in summer 2021, and offices and services currently located in the building will move to temporary locations across campus. Details on the specific moves are listed below.
Service | Temporary Location | Occupancy Dates |
---|---|---|
Dining | Kittredge | May 10-August 2, 2021 |
Lowry (Upper Level) | August 2, 2021-May 16, 2022 | |
Kittredge | May 16-July 29, 2022 | |
Dining Managers' Offices | Aultz House & Lowry Center | March 23, 2021-July 29, 2022 |
C-Store | Kittredge | May 10, 2021-July 29, 2022 |
Mom's | No Service | May 10, 2021-July 29, 2022 |
Residence Life | Hider House | April 12, 2021-January 6, 2023 |
Student Activities | Grosjean House | April 5, 2021-January 6, 2023 |
Lowry Center Building Manager | McGaw, Room 102 | April 5, 2021-July 29, 2022 |
Woo91 | Luce Hall, Room 016 | March 23, 2021-July 29, 2022 |
The Voice | Luce Hall, Room 010 | March 23, 2021-January 6, 2023 |
WAC & Scot Council | Compton Hall | March 23, 2021-January 6, 2023 |
WAC: Room 005 | ||
Scot Council: Room 007 | ||
Bookstore | Gault Schoolhouse Multi-Purpose Room | April 15, 2021-July 29, 2022 |
Post Office | Gault Schoolhouse Multi-Purpose Room | May 10, 2021-July 29, 2022 |
Copy Center | Remote Operations | May 10, 2021-July 29, 2022 |
Need to find a Meeting Space?
We’ve opened up several other places for meetings and events. All spaces that are available to request are in 25Live Pro. “Express Scheduling” can be used for same day meetings or study spaces that have a single occurrence and do not require any setup. Simply click the drop down in the “Express Scheduling” field to see the list of available options. If you are looking to schedule an event or recurring meetings, you will need to complete the full “Event Form” in 25Live Pro. Complete instructions can be found in the 25Live Pro Training Manual. Any questions about spaces or planning your event should be directed to the College’s Director of Events, Darlene Piper.
About the Lowry Center Renovation and Expansion
Thanks to the generosity of lead donors who have contributed a total of $33 million, Wooster has announced plans to move forward with the renovation and expansion of Lowry Center. The project, intended to maximize the current structure with the efficient re-use of existing spaces, will encompass an 8,000 square foot addition to the front (west-facing side) of the existing building and a renovation of the entire interior, except for The Alley, which was renovated in 2017-2018. Central dining will be relocated to the main level to increase its size, accessibility, and overall efficiency. The upper floor will be a centralized home for the Center for Diversity and Inclusion, Dean of Students, Residential Life and Student Activities, as well as a main lounge and flexible workspace for students. The College’s bookstore, post office, and MacLeod’s coffee bar and convenience store will join The Alley, radio station and breakout rooms on the lower level.
Questions?
Please questions regarding the Lowry Center renovation please contact Mike Taylor, associate vice president of facilities, design, and construction, at 330-263-2143 or via email at mitaylor@studyabroad.arkansasresearch.baraduo.com.